Mercedes Benz Stockport

Stockport’s £50m Mercedes-Benz showroom completes

Hong Kong-based developer Lei Shing Hong has completed the 350,000 sq ft car showroom in Stockport, claimed to be the largest Mercedes-Benz dealership in Europe.

The £50m development was given planning permission in October 2017 and covers a 10-acre plot alongside the M60.

Delivered by project manager K2 Consultancy alongside main contractor RG Group, the dealership has space for 150 cars indoors and a further 300 outside, and will also host a hospitality concept as well as acting for the regional sales and distribution hub for Mercedes-Benz in the North West.

LSH formerly operated out of a site on Wellington Road North and is relocating as part of the development.

Works at the £50m dealership have included remediating contaminated soils, demolition of existing buildings, and mains services diversions. Despite late design changes, the scheme was completed on programme.

The professional team on the project also included architect ATA Design; quantity surveyor Aecom; structural engineer Rolton; and M&E engineer BWB.

Your Comments

Read our comments policy here

Great for the area, but I think the rotating Mercedes Logo is a little bit American and a tad tasteless. Impressive front elevation though.

By VW Driver

Love the rotating merc badge on the roof!!

By Heaton Mersey

Great for Stockport, looks great when driving past on M60, I like rotating logo x

By Karen s

The rotating Mercedes logo is a great German idea (advertising and location finder combined) Mercedes-Benz have always used it on their buildings.

By James Yates

Another motor city icon. Stockport has far too many.

By Jean R.

A stunning development. Well worth the wait!!

By John Heyes

I wonder how long it’ll take for the Mercedes Badge to be nicked off the roof… ;-)

By Aevis

Nice to see Merc investing in stockport, UK is their biggest market, deal or no deal,they will still invest

By P Wright

There is never any mention about the guys who worked so hard during the heat and to get it done on time so this building could be open to the public, the sign is a huge statement showing that the building is there from afar, the company i work for worked realy hard 12 hours a day to get that job complete and there is never a mention of that in these articles!

By Jimmy

Brilliant project to a part of M&G Olympic manufactured and installed the Staircase and all of the Glass atrium and Stainless steel balustrade complete with bump stop rails.

By Thomas Badkin

Ooops!!!!! great imagination! Doesnt every town have an identical MB showroom? Copy of Liverpool’s; should have done something different.

By Billy

Subscribe to our newsletter