Bethell picked for £3.1m Oldfield Road contract
Salford City Council’s procurement board has signed off the contractor’s appointment to deliver an active travel corridor between Chapel Street and Regent Road.
Looking to improve walking, wheeling and cycling connectivity between critical residential, employment and regeneration areas, approval was sought at the meeting yesterday to award the contract.
The overall goal is improving sustainable access to major residential developments, including Middlewood Locks, X1 Landmark, Outwood Wharf, Regent Plaza and connectivity to University of Salford campus, while the intention is that the scheme will also support wider regeneration and growth aspirations within the area by strengthening connections to the Crescent masterplan and linking with the Bee Network’s Islington Active Neighbourhood scheme.
This will provide improved active travel routes to Chapel Street, Trinity Way and onward journeys. Key locations and accesses along the route include Regent Retail Park and trading estate, and the Liverpool Street/Middlewood Street junction.
The scheme covers around 750 metres between Chapel Street (A6) to the north and Regent Road (A57) to the south. The proposed improvements include:
- Continuous segregated cycle tracks in both directions, each 1.5m wide with a 0.5m buffer zone
- A new CYCLOPS junction at the Oldfield Road, Liverpool Street and Middlewood Street junction to improve pedestrian and cyclist safety
- Raised side-road entry treatments at James Street, Upper Wharf Street, Hulme Street, Regent Trading Estate access, Rolling Street, Hope Street, Canal Street, Cow Lane and Duncan Street
- Two new parallel signal-controlled crossings for pedestrians and cyclists
- Enhanced public realm through upgraded paving, street furniture and street lighting
- Sustainable drainage and greening measures, including tree planting, rain gardens and wildflower planting.
As recorded in the printed decisions following the meeting, the nine-month phase one contract is due to start in February 2027. Those meeting papers report that the contactor has a successful track record of delivering schemes on behalf of the city council.
The scheme is to be funded from a combination of Active Travel Fund support and Section 106 contributions.
Bethell’s contract is worth £3.1m, with a further £540,000 being signed off to cover £170,000 to Transport for Greater Manchester for signalling installation; and £370,000 for construction phase project management and supervision.
Approval is still required at GMCA level.

